Skip to main content
Iowa Lakes Community College
Main Content

The Hess Limberg Field Project

Hess Limberg Field


The Hess Limberg Field Project will include changing the existing sod infield to a new Astroturf Baseball infield measuring approximately 35,167 sf using Astroturf Diamond M Baseball turf system. The estimated contracts cost is $327,000. 

Giving Levels

Out-Of-The-Park - $50,000 and up
Grand Slam - $25,000 - $49,999
Home Run - $10,000 - $24,999
Triple - $7,500 - $9,999
Double - $5,000 - $7,499
Single - $2,500 - $4,999
Bunt - $500 - $2,499
Spectator - Less than $500

Donor recognition:

$5,000 and higher - name on a donor recognition sign.
$500 - $4,999 - name etched in brick along the new solid walkway.

 

Track the Progress:

 
Tracking Progress

 

All contributions should be sent to the Iowa Lakes Community College Foundation, a 501 (c) 3 charitable organization making all contributions tax deductible to the full extent of the law.

© 2019 Iowa Lakes Community College. All rights reserved.