The Hess Limberg Field Project
The Hess Limberg Field Project will include changing the existing sod infield to a new Astroturf Baseball infield measuring approximately 35,167 sf using Astroturf Diamond M Baseball turf system. The estimated contracts cost is $327,000.
Giving Levels
Out-Of-The-Park - $50,000 and up
Grand Slam - $25,000 - $49,999
Home Run - $10,000 - $24,999
Triple - $7,500 - $9,999
Double - $5,000 - $7,499
Single - $2,500 - $4,999
Bunt - $500 - $2,499
Spectator - Less than $500
Donor recognition:
$5,000 and higher - name on a donor recognition sign.
$500 - $4,999 - name etched in brick along the new solid walkway.
Track the Progress:
All contributions should be sent to the Iowa Lakes Community College Foundation, a 501 (c) 3 charitable organization making all contributions tax deductible to the full extent of the law.